Multi-parcel corridor acquisition budgeting and phasing (10-100+ parcels). Specializes in phasing strategy, holdout risk assessment, resource allocation, cost of delay analysis. Use for transit corridors, highway expansion, transmission lines, pipelines, mixed-use development requiring systematic acquisition planning

Overview

You are an expert in multi-parcel land assembly for infrastructure projects (10-100+ parcels), providing strategic guidance on acquisition phasing strategy, multi-parcel budgeting, resource allocation planning, and cost of delay analysis for transit corridors, highways, transmission lines, pipelines, and mixed-use developments.

Overview

Expert in multi-parcel land assembly for infrastructure projects (10-100+ parcels). Specializes in acquisition phasing strategy, multi-parcel budgeting, resource allocation planning, and cost of delay analysis for transit corridors, highways, transmission lines, pipelines, and mixed-use developments.

When to Use This Skill

Use this skill when analyzing or planning:

  • Multi-parcel acquisitions (10+ parcels for linear infrastructure)
  • Transit corridor land assembly (LRT, subway, BRT)
  • Highway expansion or new corridor development
  • Transmission line or pipeline right-of-way acquisition
  • Mixed-use development requiring multiple adjacent parcels
  • Phasing strategy for critical vs. non-critical parcels
  • Budget contingencies for valuation uncertainty, litigation, and inflation
  • Resource allocation (appraisers, negotiators, legal staff)
  • Cost of delay analysis for project timeline impacts

Key Capabilities

1. Phasing Strategy

  • Critical path analysis - Identify critical parcels that must be acquired first
  • Priority scoring - Weighted scoring based on criticality, holdout risk, and complexity
  • Parallel tracks - Identify parcels that can be acquired simultaneously
  • 4-phase framework - Critical β†’ High β†’ Medium β†’ Low priority parcels
  • Timeline estimation - Estimated duration for each phase

Scoring Methodology:

```

Priority Score = (Criticality Γ— 0.5) + (Holdout Risk Γ— 0.3) + (Complexity Γ— 0.2)

Criticality Scores:

- Critical: 100 (blocks entire project)

- High: 75 (major impact on alignment or timeline)

- Medium: 50 (moderate impact)

- Low: 25 (minimal impact)

Holdout Risk: 0.0 to 1.0 (probability of refusing reasonable offers)

Complexity: Low = 25, Medium = 50, High = 75 (inverse scoring)

```

2. Multi-Parcel Budget

  • Base budget - Sum of estimated parcel values
  • Contingencies:

- Valuation uncertainty (10% typical)

- Negotiation premium (5% typical)

- Litigation reserve (15% typical)

- Inflation adjustment (3% annual Γ— 1.5 years typical)

  • Professional fees - Appraisal, legal, environmental per parcel
  • Budget by criticality - Breakdown by critical/high/medium/low parcels
  • Per-parcel average - Total budget divided by number of parcels

Typical Contingency Rates:

```

Valuation Uncertainty: 10% (urban) to 15% (rural/complex)

Negotiation Premium: 5% (cooperative) to 10% (hostile)

Litigation Reserve: 15% (20% of parcels litigate at 1.5Γ— premium)

Inflation: 3% annual (adjust for actual timeline)

```

3. Resource Allocation

  • Appraisers - Days required for valuations
  • Negotiators - Days required for acquisition negotiations
  • Legal staff - Days required for legal documentation
  • Timeline with resources - Duration based on available staff
  • Cost breakdown - Professional services costs
  • Utilization analysis - Percentage of year utilized

Typical Resource Requirements:

```

Appraisal: 10 days/parcel (includes site visit, report, review)

Negotiation: 30 days/parcel (includes outreach, meetings, offers)

Legal: 5 days/parcel (includes title review, agreements, registration)

```

4. Cost of Delay

  • Interest carrying cost - Financing costs for delayed parcels
  • Construction delay cost - Daily construction overhead
  • Revenue loss - Lost revenue from delayed project opening
  • Per-parcel impact - Cost of delay divided by delayed parcels

Delay Cost Formula:

```

Total Delay Cost = Interest + Construction Delay + Revenue Loss

Interest = Parcel Value Γ— Interest Rate Γ— (Delay Days / 365)

Construction Delay = Construction Cost/Day Γ— Delay Days

Revenue Loss = Revenue Loss/Day Γ— Delay Days

```

Calculator Usage

Command Line

```bash

# Basic usage

python land_assembly_calculator.py input.json

# Save markdown report

python land_assembly_calculator.py input.json --output report.md

# Save JSON output

python land_assembly_calculator.py input.json --json results.json

# Both markdown and JSON

python land_assembly_calculator.py input.json --output report.md --json results.json

# Verbose mode

python land_assembly_calculator.py input.json --verbose

```

Input JSON Format

```json

{

"project_name": "Transit Corridor Land Assembly",

"project_type": "transit_corridor",

"parcels": [

{

"id": "P001",

"address": "100 Main Street",

"area_sqm": 2500,

"estimated_value": 750000,

"criticality": "critical",

"complexity": "high",

"holdout_risk": 0.6

}

],

"priorities": {

"criticality": 0.5,

"holdout_risk": 0.3,

"complexity": 0.2

},

"resources": {

"appraisers": 3,

"negotiators": 5,

"legal_staff": 2

},

"contingencies": {

"valuation_uncertainty": 0.10,

"negotiation_premium": 0.05,

"litigation_reserve": 0.15,

"inflation": 0.03

},

"delay_analysis": {

"interest_rate": 0.05,

"construction_cost_per_day": 50000,

"revenue_loss_per_day": 25000,

"project_start_delay_days": 90

}

}

```

See land_assembly_input_schema.json for complete schema documentation.

Sample Input

A 50-parcel transit corridor example is provided:

```bash

python land_assembly_calculator.py samples/sample_1_transit_corridor_50_parcels.json

```

Output

Markdown Report Sections

  1. Executive Summary - Key metrics table
  2. Acquisition Phasing Strategy - Phases, parallel tracks, top priority parcels
  3. Budget Analysis - Budget summary, contingency breakdown, budget by criticality
  4. Resource Allocation Plan - Timeline, costs, utilization
  5. Cost of Delay Analysis - Delay costs for critical parcels (if applicable)

JSON Output

Complete structured output including:

  • Metadata (project name, timestamp, version)
  • Phasing strategy (phases, parallel tracks, scored parcels)
  • Budget analysis (base, contingencies, total, breakdown)
  • Resource allocation (timeline, costs, utilization)
  • Delay cost analysis (if applicable)
  • Input parameters (for reproducibility)

Shared Utilities

This calculator uses the following shared modules:

land_assembly_utils.py

  • calculate_phasing_strategy() - Phasing algorithm
  • multi_parcel_budget() - Budget calculation
  • cost_of_delay() - Delay cost analysis
  • resource_allocation_plan() - Resource planning
  • contingency_budget() - Contingency calculation

timeline_utils.py

  • calculate_critical_path() - Critical path analysis (for timeline)
  • calculate_resource_requirements() - Resource requirement calculation

risk_utils.py

  • assess_holdout_risk() - Holdout risk assessment
  • litigation_risk_assessment() - Litigation probability

Best Practices

1. Parcel Criticality Classification

Critical Parcels:

  • Block entire project alignment
  • Required for project start
  • No alternative alignment possible
  • High priority for early acquisition

High Priority:

  • Major impact on alignment or cost
  • Limited alternatives available
  • Significant project delay if not acquired
  • Moderate priority for early acquisition

Medium Priority:

  • Some flexibility in alignment
  • Multiple alternatives available
  • Moderate project impact
  • Can be acquired in later phases

Low Priority:

  • Minimal project impact
  • Many alternatives available
  • Optional or enhancement parcels
  • Acquire last to preserve budget

2. Holdout Risk Assessment

High Risk (0.6 - 1.0):

  • Owner emotionally attached to property
  • Business-critical location
  • Sophisticated owner with legal representation
  • Limited relocation options
  • Previous experience with holdouts

Medium Risk (0.3 - 0.6):

  • Owner has moderate attachment
  • Some business impact
  • Some relocation options available
  • Moderate negotiation experience

Low Risk (0.0 - 0.3):

  • Owner willing to sell
  • Financial need for liquidity
  • Many relocation options
  • Limited negotiation sophistication
  • Timeline pressure to relocate

3. Complexity Assessment

High Complexity:

  • Multiple owners or tenants
  • Environmental contamination
  • Title defects or encumbrances
  • Zoning or land use issues
  • Heritage designation

Medium Complexity:

  • Single owner with some complications
  • Minor environmental concerns
  • Standard title review required
  • Typical zoning compliance

Low Complexity:

  • Single owner, clear title
  • No environmental issues
  • Standard zoning
  • Cooperative owner

4. Resource Planning

Appraisers:

  • 1 appraiser per 15-20 parcels (with 10 days/parcel)
  • Increase if complex valuations or tight deadlines
  • Consider hiring external appraisers for overflow

Negotiators:

  • 1 negotiator per 10 parcels (with 30 days/parcel)
  • Increase for high holdout risk parcels
  • Senior negotiators for critical parcels

Legal Staff:

  • 1 lawyer per 25 parcels (with 5 days/parcel)
  • Increase if title issues or litigation expected
  • External counsel for complex cases

5. Budget Contingencies

Adjust contingencies based on:

  • Market conditions (hot market = higher premium)
  • Owner sophistication (experienced = higher negotiation costs)
  • Timeline pressure (tight schedule = higher costs)
  • Litigation history (hostile jurisdiction = higher reserve)
  • Inflation environment (high inflation = larger adjustment)

Key Terms

  • Land Assembly - Acquisition of multiple adjacent or corridor parcels
  • Critical Parcel - Parcel essential for project success
  • Holdout Risk - Probability owner refuses reasonable offers
  • Phasing Strategy - Sequential acquisition plan by priority
  • Parallel Track - Multiple parcels acquired simultaneously
  • Litigation Reserve - Budget contingency for expropriation proceedings
  • Cost of Delay - Financial impact of delayed parcel acquisition
  • Resource Allocation - Distribution of staff across parcels
  • Priority Score - Weighted ranking for acquisition sequence

Related Skills

  • expropriation-compensation-entitlement-analysis - Statutory compensation calculation
  • injurious-affection-assessment - Construction and proximity damages
  • agricultural-easement-negotiation-frameworks - Farm operation impacts
  • easement-valuation-methods - ROW and easement valuation
  • expropriation-statutory-deadline-tracking - Timeline management

Examples

Transit Corridor (50 Parcels)

Scenario: Urban LRT corridor requiring 50 parcels

  • 8 critical parcels (station sites, alignment constraints)
  • 15 high priority parcels (main corridor)
  • 15 medium priority parcels (some flexibility)
  • 12 low priority parcels (optional enhancements)

Strategy:

  • Phase 1 (3 months): 8 critical parcels, parallel acquisition
  • Phase 2 (4 months): 15 high priority parcels, parallel acquisition
  • Phase 3 (5 months): 15 medium priority parcels, sequential
  • Phase 4 (6 months): 12 low priority parcels, sequential

Budget: $40M base + $13M contingencies (32%) = $53M total

Highway Expansion (100 Parcels)

Scenario: Highway widening requiring 100 parcels

  • 10 critical parcels (bridges, interchanges)
  • 30 high priority parcels (main alignment)
  • 40 medium priority parcels (some flexibility)
  • 20 low priority parcels (noise walls, drainage)

Strategy:

  • Phase 1: 10 critical, 5 parallel tracks
  • Phase 2: 30 high priority, 6 parallel tracks
  • Phase 3: 40 medium priority, sequential
  • Phase 4: 20 low priority, sequential

Budget: $75M base + $24M contingencies (32%) = $99M total

Transmission Line (200 Parcels)

Scenario: 50km transmission corridor requiring 200 easements

  • 25 critical parcels (tower sites, substation)
  • 75 high priority parcels (main corridor)
  • 75 medium priority parcels (some routing flexibility)
  • 25 low priority parcels (access roads)

Strategy:

  • Phase 1: 25 critical, 5 parallel tracks, 6 months
  • Phase 2: 75 high priority, 10 parallel tracks, 9 months
  • Phase 3: 75 medium priority, sequential, 12 months
  • Phase 4: 25 low priority, sequential, 6 months

Budget: $15M base + $5M contingencies (33%) = $20M total

Version History

  • 1.0.0 (2025-11-17) - Initial release with phasing, budgeting, resource allocation, and delay cost analysis